How to install 4 side planer moulder machine after buying it?2026-06-17T11:28:46+08:00

ELASN moulder

Four Side Planer Moulder Machine

Max. processing width: 230 mm

Min. processing width: 15 mm

Processing thickness: 10-120 mm

Min. processing length: 550 mm

Feeding speed: 10-35 m/min

Weight: 3300 kg

Second Hand Used Four Sided Planing Machines Woodworking

Four Side Planer Moulder Machine with Sawing Machine working principle

4 Sided Planer Moulder Machines is an automatic 4-sided planer with 4 main spindles, compact and sturdy, capable of processing wood with a width range and height.
It is mainly used for planing the upper and lower sides of wood products such as wood boards, decorative wood lines and wooden floors.

How to install 4 side planer moulder machine after buying it?

The buyer can use a forklift or use a lifting rope with sufficient strength to slowly lower the four side planer moulder machine to the ground.

If you want to be an experienced or skilled worker with four sided planer machine, please look the article following carefully.

Before the 4 sided planer moulder machine is being installed, the factory packaging chassis or wooden frame must be removed first, and the adjustment plate provided given the factory previously must be installed in the adjustment position.

working section of 4 sided planer moulder machine

After the installation of the gasket, a precision strip level is used to calibrate the vertical and horizontal levels based on the working plane.

Before installing the tool, please turn off the power, clean the spindle with a clean cotton cloth, and evenly apply the lubricating oil to the spindle and the inner hole of the tool.

The installation of the lower tool is composed of two parts: trimming knife and lower cutting knife. It is particularly noteworthy that the edge and lower knife blades are staggered during installation, and the tool shaft nut is locked after the inspection is correct.

Use the calibration ruler and the guide bar of the edge knife closely, reverse the shaft of the knife to check the edge knife, so that the tip of the edge knife is slightly in contact with the calibration ruler.

detail of 4 sided planer moulder machine

Next, use the calibration ruler to keep close to the working table, reverse the tool shaft to check the lower cutting tool, and make the tip of the lower cutting tool slightly contact the correction ruler by lifting the tool shaft.

Use the correction ruler and the middle guide bar close, reverse the tool shaft to check the right vertical tool, by the method of advancing and reversing the tool shaft so that the right vertical tool tip and the correction ruler slightly contact.

Use a relatively flat board and the guide bar of the workbench, reverse the tool shaft to check the left vertical tool, and make the tip of the left vertical tool slightly contact the board by advancing and reversing the tool shaft.

working section of 4 sided planer moulder machine

The adjustment of the left vertical tool side press wheel is about 1.5mm higher than the cutting dome of the tool.

Upper tool debugging: use a relatively flat board and the guide bar of the workbench, reverse the tool shaft to check the upper tool, and make the tip of the upper tool slightly contact the board by lifting the tool shaft.

The front pressure plate is adjusted about 1.5mm lower than the bottom of the tool cutting circle.

detail of 4 sided planer moulder machine

Install all shaft guards in place after tool commissioning, and adjust the side chain conveyor to the size of the board.

Next, the equipment is tested, the tool shaft and the feeding system are started, the stopper checks the linear accuracy of the work piece, the digital caliper checks the equal width of the work piece, and the accuracy meets the requirements.

working section of 4 sided planer moulder machine

Related Products

Get A Free Quote




    FAQ

    Most industrial 4 side planer moulders can be installed within 1–2 working days, depending on workshop conditions and operator experience. Additional time may be required for cutterhead calibration, electrical wiring, and test production.
    Not always. Medium and large industrial models are typically installed on a reinforced concrete floor to minimize vibration and ensure machining accuracy. Smaller machines may be placed on a heavy-duty level surface if recommended by the manufacturer.

    The power supply must match the machine specifications, including voltage, phase, frequency, and circuit protection requirements. Many industrial four side moulders operate on 380V/50Hz three-phase power, although customized configurations are available.

    Use a precision spirit level to check both longitudinal and transverse directions of the working table. Proper leveling prevents twisting, uneven cutting, and dimensional inaccuracies during production.

    Yes. All cutterheads must be installed, aligned, and securely locked before startup. After installation, manually rotate each spindle to verify there is sufficient clearance and no interference.

    Operators should verify:

    • Feeding smoothness
    • Surface finish quality
    • Final width and thickness dimensions
    • Squareness of the workpiece
    • Machine vibration and unusual noises

    Any abnormalities should be corrected before full production begins.

    Yes. Four side planer moulders generate a large amount of wood chips and fine dust. A properly sized dust collection system improves machining quality, protects internal components, and reduces fire risks.

    Many experienced woodworking factories can perform installation independently using the operation manual and remote technical support. However, first-time users may benefit from online guidance or on-site commissioning services provided by the manufacturer.

    Common causes include:

    • Improper machine leveling;
    • Incorrect cutterhead adjustment;
    • Uneven feed roller pressure;
    • Worn or improperly installed knives.

    Regular calibration helps maintain dimensional consistency.

    Calibration frequency depends on production volume. For continuous industrial operation, manufacturers generally recommend checking cutterhead settings and feed systems weekly, while a full inspection should be performed during scheduled maintenance intervals.

    After Buying Services

    Yes. ELASN can provide installation manuals, remote video assistance, and technical guidance to help customers complete machine commissioning efficiently.

    Common tools include forklifts, lifting straps, spirit levels, calibration rulers, torque wrenches, and electrical testing equipment.
    Yes. ELASN can customize voltage and frequency requirements according to the customer’s local standards, including 220V, 380V, 415V, and 460V configurations.